Difference between revisions of "Palace Theatre [Rheinsberg] (Q8532)"
From CanonBase
(Created claim: Building date (P101): 1994) | (Created claim: opening date (or re-opening) (P102): 30 November 1999) | ||||||||||||||
Property / opening date (or re-opening) | |||||||||||||||
+ | 30 November 1999
| ||||||||||||||
Property / opening date (or re-opening): 30 November 1999 / rank | |||||||||||||||
+ | Normal rank |
Revision as of 05:45, 18 July 2023
Theatre building in Rheinsberg, Germany
- Palace Theatre
Language | Label | Description | Also known as |
---|---|---|---|
English | Palace Theatre [Rheinsberg] | Theatre building in Rheinsberg, Germany |
|
Statements
53°5'54.240"N, 12°53'24.090"E
0 references
1774
Heinrich lässt von seinem Baumeister Carl Wilhelm Hennert das neue »Komödienhaus« errichten. Es ist Spielstätte für Musiktheater und Schauspiel: 94 Fuß lang mit zwei Rängen, von gewundenen Säulen getragen. Die Bühne misst etwa 15 mal 17 Meter und entspricht einschließlich der Bühnentechnik modernsten Ansprüchen der Zeit. In diesem Theater bietet Heinrich alles, was man in Berlin wegen des „verstaubten“ Geschmacks Friedrichs nur selten erleben kann: die moderne französische und die italienische Oper. (German)
Heinrich has the new "Komödienhaus" built by his master builder Carl Wilhelm Hennert. It is a venue for musical theatre and drama: 94 feet long with two tiers, supported by winding columns. The stage measures about 15 by 17 metres and, including the stage technology, meets the most modern demands of the time. In this theatre, Heinrich offers everything that can rarely be experienced in Berlin because of Friedrich's "dusty" taste: modern French and Italian opera. (English)
0 references
30 November 1999
0 references
Schlossanlage, 16831 Rheinsberg
0 references
139
0 references
1802
After Prince Heinrich of Prussia's death, the theatre is closed down. The theatre gradually falls into disrepair. (English)
0 references
29 April 1945
Am 29. April 1945 wird das Theater von einer Granate getroffen und weitgehend zerstört. (German)
0 references
1994
Unter Leitung des Architekten Gottfried Hein wird der Wiederaufbau des Theaters geplant. Gleichzeitig gibt es erste Aufführungen in der Ruine. Dazu muss zunächst die Fassade gesichert, ein Holzfußboden eingezogen und entsprechende Technik eingebaut werden. Kammeroper, die Musikakademie und die Stiftung Preußische Schlösser und Gärten sind dabei die Partner. (German)
0 references